Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Asset Information Management

Setup

  • Last UpdatedMar 26, 2026
  • 2 minute read

Prerequisites

The prerequisites for the integration are:

  • The AVEVA Data Pipeline is required to process the incoming APCM data.

  • AIM-A must be added as an asset to the correct Data Pipeline account before it can process APCM data.

  • Markups and objects (which APCM needs to integrate with) should be classified in AIM-A.

CONNECT requirements

To provide AIM-A as an available integration for APCM, as seen in CONNECT, ensure that both of the solutions are available and enabled. They can be at different folder levels in CONNECT.

  1. Log into CONNECT.

  2. Turn the Point Cloud Manager solution on and select the 3-dots.

  3. From the APCM solution menu select Manage roles.

  4. Assign the Data Pipeline User role and select Save.

  5. From the APCM solution menu select Manage integrations.

  6. Select the appropriate PCM to AIM-A integration and select Next.

    Note: For further configuration, refer to Set up PCM-AIM integration.

Whitelist APCM URL in AIM

To ensure the Data Pipeline allows access to the APCM URLs (as specified in the InfoLocator attribute) to be processed, raise a support ticket with AVEVA to add all domains (present in the APCM URLs) to the Import Server's SafeDomains list.

In This Topic
TitleResults for “How to create a CRG?”Also Available in