Allocate MMT items to a transport package
- Last UpdatedMay 07, 2026
- 1 minute read
Allocate items from a Material Movement Ticket (MMT) to a transport package. In the s51006 Material Movement Ticket screen, in the Expediting Items grid, in the Un Allocated grid, in the OutstandingQuantity field, ensure the MMT item has a value.
-
Navigate to the s51010 Transport Package screen.
-
In the Project Selection control block, from the Project dropdown, select the required project ID.
-
To refresh the screen, select the F5 key.
-
In the Package grid, select a row.
-
On the s51010 menu, in the Add Items group, select Allocate MMT.
The d0264 Add items from MMT dialog appears.
-
In the Filter Criteria control block, from the MMT dropdown, select the ID of the required MMT.
-
To refresh the dialog, select the F5 key.
-
In the MMT Items grid, select one or more rows, and then select the Enter key.
In the Package Item grid, the selected items appear.
-
In the Package Item grid, in the Insert Qty field, enter the quantity of the item you want to allocate to the transport package.
-
Select Insert.
In the Items grid, the allocated MMT items appear.
-
On the Home menu, in the Record group, select Save.
The items from the MMT are allocated to the transport package.