Update the system number of an ABoM header and ABoM item
- Last UpdatedMay 07, 2026
- 1 minute read
Update the System field of an Advance Bill of Materials (ABoM) header and an ABoM item as defined in the System field in the ABOM Default Values control block. Before you begin, in the ABOM Default Values control block, in the System field, ensure a value is defined.
-
Navigate to the s21002 Advance Bill of Materials - ABoM screen.
-
In the Current Project control block, from the Project dropdown, select the ID of the required project.
-
To refresh the screen, select the F5 key.
-
In the Advance Bill of Materials grid, select a row.
-
In the Advance Bill Of Material Items grid, select a row.
-
On the s21002 menu, in the Options group, select Update System.
For the selected ABoM header, in the Advance Bill of Materials grid, the value in the System field is copied from the System field in the ABOM Default Values control block.
For the selected ABoM item, in the Advance Bill Of Material Items grid, the value in the System field is copied from the System field in the ABOM Default Values control block.
-
To save the changes, on the Home menu, in the Record group, select Save.