Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise Resource Management

AVEVA Enterprise Resource Management 19​.5​.1 release notes

AVEVA Enterprise Resource Management 19​.5​.1 release notes

  • Last UpdatedJun 08, 2026
  • 10 minute read

New features and enhancements

AVEVA Materials

  • s40001 Requisition Register - MR Filter Enhancement: In the s40001 Requisition Register screen, you can now use the two filters Part List Header (localised) and Part List Item (localised) on multi-level hierarchy filters. The enhancement ensures only the correct material is transferred to the material requisition.

  • Performance Improvement of Online Material Status Calculation: The performance of the Online Material Status Calculation functionality is now improved by optimizing the material status calculation, material requisition status calculation, and planning material status calculation. The enhancement ensures the correct material quantities are available as quick as possible to avoid delays.

AVEVA Planning and Construction

  • Performance Improvements for Construction Gantt view screen:

    • The s11001 Project Gantt View, the s70001 Construction Gantt View, and the s71001 Engineering Gantt View screens are enhanced with performance improvements such as faster data loading, better responsiveness, and enhanced user feedback when working with large-scale project data.

    • Configuration options are now available to optimize screen performance. In the d0073 ERM System Settings dialog, in the Planning and Construction section, two new options are now available:

      • Enable Lazy Load of Materials: To reduce load time and memory usage for material-heavy projects

      • Enable Calculation of Norm Hour: To automate labour estimation and support planning activities.

  • Integration to WorkPacks: WorkPacks users with a CONNECT account can now subscribe to AVEVA Integration Service (AIS) in CONNECT to send and receive data from on-premise AVEVA Enterprise Resource Management. The authentication is handled using CONNECT User Token or Service Token. The setup ensures secure authentication and authorization, protected data transmission, and accurate synchronization of engineering data between on-premise AVEVA Enterprise Resource Management and WorkPacks.

Resolved issues

AVEVA Material

Case No

Defect No

Description

960639066

4102406

In the s60028 Stock Item Delivery Registration screen, the application does not freeze when you try to receive a material with the default store different from the Purchase Order (PO).

962609163

4349475

In the s52006 Inspection Visits screen, NRC/IRC visit approval, release constraints, and expediting deallocation issues are fixed.

962611955

4402536

In the s50018 Purchase Order screen, issues with Raise Revision and Submit For Approval workflows are fixed.

962611955

4468124

The d0202 Approval Flow Designer dialog is now responsive when you call the dialog from the s50018 Purchase Order screen.

962622608

4359321

In the s51004 Expediting screen, you can now save the data once you enter a value in the Actual Dispatch Date field.

962630084

4349572

In the s50018 Purchase Order screen, data extraction does not generate a file when a publish fails.

962643188

4428097

In the s60028 Stock Item Delivery Registration screen, you can now view PO items after a CSV file import through a data import.

962644382

4365968

In the s50016 Technical Material Requisition screen, when you issue a Technical Material Requisition (TMR), the system does not trigger an 'Object reference not set to an instance of an object' error.

962645652

4360788

In the s20011 Standard Materials screen, when you publish a part from the Catalogue Manager, the issue that updates the unit of a standard material already used in a Material Take-Off (MTO) or a TMR is fixed.

962648783

4369087

In the s50018 Purchase Order screen, you can now import new PO items with new standard materials.

962653791

4377493

In the s50013 Contacts screen, issues with roles assignment for excluded projects compared to closed projects are fixed.

962654696

4382528

In the s50018 Purchase Order screen, the issue with buyer selection when you create a PO is fixed.

962657798

4442822

In the s60007 Maintain Material Non-Conformance screen, when an OSD is repaired, the Updated At field is now updated.

962663022

4434237

In the s50018 Purchase Orders screen, Net Value fields in the header are now updated on import.

962665184

4428215

In the s60030 Warehouse Dispatch List screen, a reservation deadlock prevents the creation of a picking list. Reservations break when stock is moved after the reservation is made. You can now make a picking list for the remaining items.

962666823

4405114

In the s53000 Invoice Verification screen, you cannot change the data in the Transfer Accepted Status field.

962668747

4426811

In the s20011 Standard Materials screen, the ROP and the ROQ fields now allow decimal values.

962670535

4420915

In the s50017 Buyers Queue screen, TMR changes with 0 TMR quantity now appear.

962672737

4426816

In the s60021 Move Material Between Projects screen, the system does not trigger an error when you move materials in the single project mode.

962675320

4530751

In the s51004 Expediting screen, you can now format cells in an Excel file created by export from the s51004 Expediting screen.

962676318

4468385

In the s53000 Invoice Verification screen, items where the received status is PRELIM do not appear when you select From Delivery in the invoice register.

962676851

4434254

In the s21002 Advance Bill of Materials screen, the materials to include in a material status calculation are now flagged as 'For Requisition' (FR).

962682105

4426841

In the s20010 Project Components screen, you can now create a project component ID with a (-) separator after the set up of the separator in the s10001 Projects screen.

962695879

4434397

In the s20017 Fabricate Catalogue screen, the time taken to bulk paste records is reduced.

962696353

4437152

In the s20017 Fabricate Catalogue screen, the time taken to load data is reduced.

962697153

4440800

In the s00034 Custom Property Definition screen, the naming of Delivery Request List (DRL) items is now consistent.

962698422

4445311

In the s50018 Purchase Orders screen, the numbering issue when a user adds a PO position manually is fixed.

When you create a new Purchase Order position during import, the system now correctly determines the procurement line type as follows:

  • If the procurement line type is specified in the import file, the procurement line type is used.

  • If the procurement line type is not specified in the import file, the system retrieves the default value from the strategy object based on project configuration rules.

    Additionally, the logic to generate position numbers is enhanced with an extra validation step to prevent duplicates:

  • A candidate position number is generated.

  • The system checks whether the position number is already in use.

  • If the position number is already in use, the system increases the position number by one until an available position number is found.

  • The enhancement ensures the generation of unique position numbers and prevents position number collisions.

962699671

4445348

In the s60031 Picking Lists screen, the Oracle error that appeared when you try to overpick materials with a quantity not available in stock is fixed.

962705608

4454565

In the s51004 Expediting screen, performance issues when you load expedite items are fixed.

962711129

4539671

In the s10018 Financial Account Codes screen, you can now successfully import Financial Account Codes (FACs) when you insert or update the FACs with a different cost account status.

962711990

4487632

In the s50016 Technical Material Requisition screen, the Copy VDRS from TMR functionality now allows the copy of custom property values.

962717402

4504223

In the s10001 Projects screen, the Automated MTO Priority field now shows a value in the s10001 Projects screen in the single record view.

962717472

4506554

In the s20205 Data Import screen, you can now reject the import of a TMR header.

962723961

4515712

In the s21030 Bill of Quantity screen, the Progress Bar is now visible.

962728325

4517993

In the s50037 Procurement Schedules screen, you can now copy the Title and the MR/TMR fields when you use the Bulk Copy MR/TMR Related functionality.

962736258

4528604

In the s22020 Pipelines screen, the issue with the Issue Pipeline functionality for deactivated pipelines is fixed.

962736660

4537584

In the s50016 Technical Material Requisition screen, you can now import TMRs containing a project component that is created in the same import.

962741963

4544192

In the s51004 Expediting screen, the error message that appeared for a different PO when you attempt to create an Material Movement Ticket (MMT) for a particular PO is fixed.

962742175

4556644

In the s60031 Picking Lists screen, material substitution now breaks the DRL reservations of substituted materials. The deletion of material reservations and material detail reservations when you completely substitute a material in a picking list is implemented.

962742226

4587214

In the s50018 Purchase Order screen, performance issues when you search for buyers in the List of Values is fixed.

962742735

4556861

From the s50017 Buyers Queue screen, the Buyer field is not populated into the 50018 Purchase Orders and the 50019 Request for Quote screens. If no buyer is assigned to a requisition in the buyers queue, then the current user is assigned as the buyer.

962751653

4571614

In the s50017 Buyers Queue screen, TMR changes applied to an existing PO now function as expected.

962751656

4566049

4606513

In the s50017 Buyers Queue screen, the correct Request For Quote (RFQ) quantity appears in the s50017 Buyers Queue screen after creating a new RFQ round.

962751739

4568854

In the s50019 Request for Quote screen, the value in the TMR Id field appears in the RFQ position for the new RFQ round.

962751742

4565995

In the s50020 Followup on Request for Quote screen, the user is not allowed to edit a closed quote.

962753043

4568838

In the s50019 Request for Quote screen, the d0369 Send emails to invited suppliers dialog does not throw a Missing Email Template error. The issue occurs when the default language is not English and no corresponding template exists. Previously, the process was blocked from the email send functionality. With the fix, users can select an ENG template if the default language template for a screen is not available.

962753636

4565968

In the s52006 Inspection Visits screen, the value in the Material Id field now appears in the Inspection Items single record view.

962753739

4565862

In the s50018 Purchase Order screen, issues with the workflow on reopening or raising revisions of a PO are fixed.

962755502

4576921

In the s50019 Request for Quote screen, the RFQ number now appears in the E-mail attachment.

962770534

4624315

In the s22041 General MTO screen, inconsistent performance issues when you approve a large number of MTOs are fixed.

962783175

4669460

In the s50016 Technical Material Requisition screen, the system assigns the correct system ID at the TMR item level when a TMR is transferred from an MR.

962789322

4681401

In the s23001 Site MTO screen, the deletion of an MTO revision now reverts the quantity changes.

962809972

4741812

In the s60030 Warehouse Dispatch list screen, you can now transfer some items from the s60030 Warehouse Dispatch screen to the s60031 Picking Lists screen.

962813431

4752109

In the s50016 Technical Material Requisition screen, after adjustment additions in the Summaries tab, values now appear correctly in the s50016 Technical Material Requisition screen.

962819025

4755909

In the s20011 Standard Materials screen, you can now update standard material dimensions for multiple items through the Oracle package.

962825541

4770630

In the s21026 Material Summaries screen, the calculations for Working Surplus and Contingency now function correctly.

962788403

962624411

4687420

4353543

In the s61011 Work Item Overview screen, the inconsistency in placeholder values and availability for work item and action emails is fixed.

AVEVA Planning and Construction

Case No

Defect No

Description

960600268

4388453

In the s11001 Project Gantt View screen, the Load Chart functionality now displays the information correctly.

962607084

4322391

In the 70004 Production Back Reporting screen, performance issues when you load data are fixed.

962651312

4442593

In the s11001 Project Gantt View screen, a system error on data load where the planning activity count for a project exceeds 28,000 is fixed.

962651479

4409818

In the s11001 Project Gantt View screen, the WBS Activity import issue is fixed.

962664642

4409820

In the s11001 Project Gantt View screen, the imported duration is now maintained.

962693310

4434399

In the s70001 Construction Gantt view screen, the performance issues when you load data are fixed.

962699347

4465206

In the s70005 Product Codes and Norms screen, the product codes are now calculated per project.

962700498

4502599

In the s70001 Construction Gantt view screen, the error that appeared when you change material scope in Construction Gantt view is fixed.

962715427

4577185

In the s70001 Construction Gantt view screen, the Snapshot Create functionality is now available for all applicable activities.

962734052

4543553

In the s11001 Project Gantt View screen, activity bulk import is fixed to accept the Released status on the first import.

962734052

4571011

In the s11001 Project Gantt View screen, activity CSV bulk import is fixed to accept the Released status on the first import.

962734562

4543551

In the s70001 Construction Gantt view screen, performance issues when you add materials in Installation Kitting and when you accept the creation of a new DRL are fixed.

962815362

4749733

In the s11001 Project Gantt View screen, the numeric overflow error (ORA-01426) that prevented Installation Kitting Material Need from being moved is fixed.

962815382

4749736

In the s11001 Project Gantt View screen, you can now load maximum number of records in Installation Kitting.

962819811

4759483

In the s11001 Project Gantt View screen, performance issues when you load the data are fixed.

AVEVA Catalogue Manager

Case No

Defect No

Description

962646965

4366008

In the s80230 Catalogue Data Export screen, users with Read access can now scroll and use the row filter in the Section Details Attribute block.

962667661

4421367

In the s80230 Catalogue Data Export screen, you can now export data.

962693310

4436350

In the s80130 Component Types screen, a filtered search with fewer results loads faster than an unfiltered load of all records.

962704695

4581594

In the s81260 Design Specifications screen, the export of specification takes lesser time to generate files.

962707700

4524656

In the s81210 Specifications screen, fixed the Q-UPUB report to include parts not published to Standard Material on Spec Approval.

962714547

4504534

In the s80230 Catalogue Data Export screen, the Oracle error on Bolting Specification export via the Transfer Files functionality caused by BLEN and BWEI is fixed.

962738559

4542716

In the s80230 Catalogue Data Export screen, the Selection Filter by Part functionality now loads data after an export.

962749268

4557167

In the s81210 Specifications screen, you can now use size ranges immediately after creation.

962760012

4376705

In the s81260 Design Specification screen, performance issues when you export weights to AVEVA E3D are fixed.

962760941

4586846

In the s81210 Specifications screen, the Oracle parse error that appeared during new part generation is fixed.

AVEVA Common

Case No

Defect No

Description

960667925

4443728

The issues caused with installing Views during the upgrade from 16 series versions to 19 series versions are fixed.

962480614

4294055

In the s00069 Custom Action Buttons screen, you can now delete a new record.

962623685

4349459

When you use the Copy or Paste functionality, the paste functionality can now handle clipboard content from Microsoft Excel (without Status icon) and clipboard content from the grid (with Status icon). The column alignment now appears correctly.

962624501

4347176

In the s22050 Import screen, the Process and Compare changes are now highlighted in the Microsoft Excel report.

962635220

4347163

Issues with high CPU usage after launching the report viewer observed earlier is fixed.

962648863

4382449

In the s12003 View Definitions screen, the issue when you save or refresh new columns for a view for which a CPV with Lookup is setup already is fixed.

962657820

4424191

Issues with user access to reports is fixed.

962659511

4403217

Issues with user access to POs based on the roles across different projects is fixed.

962664251

4426774

The performance of the filter expression in the Grid filter is working as expected.

962678913

4421285

In the s22050 Import screen, issues with pre-processors with Lua plugins are fixed.

962707712

4498504

In the s12003 View Definitions screen, specification type for the s81210 Specifications screen is now supported.

962750665

4562479

The export of Lua extensions to Microsoft Excel are now working.

962811186

4739280

In the s12003 View Definitions screen, you can now search with a parameter.

4449505

The CreateErmAdminUsersFromConnectCommand now refreshes the user_role_mv.

Known issues

N/A

TitleResults for “How to create a CRG?”Also Available in